Buyers typically pay by the ton or by the cubic yard, with total costs influenced by location, material fines, and delivery distance. The main cost drivers are material type, quantity, and transport, followed by permits and crew time if site preparation is required. This article presents cost ranges in USD and practical pricing guidance for crusher run use.
| Item | Low | Average | High | Notes |
|---|---|---|---|---|
| Crusher Run (per ton) | $12 | $18 | $35 | Includes material and delivery to site; variations by region |
| Crusher Run (per cubic yard) | $15 | $25 | $40 | Typically 1.5″ minus; depends on density |
| Delivery/Haulage (flat fee) | $50 | $150 | $300 | Distance-based or minimums apply |
| Minimum Load Charge | $50 | $100 | $300 | Some suppliers apply minimums for small orders |
| Labor & Installation (if compacted) | $1.50 | $3.50 | $6.00 | Per sq ft or per hour depending on project |
| Edge/Drainage Accessories | $5 | $20 | $60 | Geotextile, edging, or drainage pipes |
Assumptions: region, specs, labor hours.
Typical Cost Range
Crusher run is commonly sold by the ton or by the cubic yard. In most U.S. markets, expect a range from about $12 to $35 per ton and $15 to $40 per cubic yard, depending on rock type, fines content, and local transport costs. Delivery fees often add $50–$150 for short hauls, with longer distances raising delivery costs further. When site prep or compaction is needed, add labor costs at roughly $1.50–$6.00 per square foot for compacted application, or $30–$60 per hour for crew time. Perimeter edging, geotextile, and drainage accessories add modest extras.
For projects with large quantities, some suppliers offer volume discounts or material-by-volume pricing (e.g., per square yard at 4–6 inches depth). Contractors might quote a price per ton plus a delivery fee, or a per cubic yard price that includes delivery. Assumptions: dense rock type, standard delivery radius, no special additives.
Cost Breakdown
| Materials | Labor | Equipment | Permits | Delivery/Disposal | Warranty | Taxes | Contingency |
|---|---|---|---|---|---|---|---|
| $12–$35/ton or $15–$40/yd3 | $1.50–$6.00/ft2 | Equipment rental or mobilization | Typically none; check local rules | $50–$300 delivery | Limited standard materials warranty | varies | 5–10% recommended |
data-formula=”labor_hours × hourly_rate”>
Pricing Variables
The price of crusher run hinges on several factors. Material composition (stone size, fines content) affects density and price per ton. Distance to site drives delivery fees and fuel surcharges. Quantity influences per-ton discounts and minimum load charges. Seasonal demand and regional supply constraints can shift prices by 10–20% in peak periods.
Regional Price Differences
Prices differ across U.S. regions due to rock availability and transportation costs. In the West, higher rock quality and longer hauls can push crusher run toward the upper end of the range. The Midwest often sees moderate costs with strong competition among local quarries. In the South, closer quarries can yield lower delivery fees, though demand for residential driveways and drainage projects can elevate prices during busy seasons. Expect regional deltas of roughly ±15–25% between markets.
Labor, Hours & Rates
Independent crews or contractors may be hired for site prep and compaction. Typical rates range from $30–$60 per hour for labor, with crew sizes of 2–4 people. For large driveways or commercial applications, expect higher crew costs due to longer shifts and equipment needs. Site prep time and compaction requirements will influence total project hours and cost.
Additional & Hidden Costs
Some projects incur extras beyond material and delivery. Geotextile fabric or edging can add $5–$20 per linear foot. Drainage pipes or catch basins may be necessary, adding $50–$300 depending on length and complexity. If permits are required for large grading or drainage work, permit fees can add dozens to hundreds of dollars. Unforeseen site conditions like poor subgrade may require additional stabilization.
Real-World Pricing Examples
Three scenario snapshots illustrate typical ranges. Basic project uses standard 1.5″ minus crusher run for a 500-square-foot driveway with 4 inches of depth and standard delivery. Mid-Range includes 1,000 square feet of driveway, some edge restraints, and light compaction. Premium adds higher-quality material with geotextile, extended compaction, and faster delivery. All figures assume local market conditions and 10–15% contingency.
- Basic — 500 ft², 4″ depth, standard delivery: Material: 12–20 tons; Delivery: $60–$180; Labor/Compaction: $75–$300; Total: $1,200–$1,800
- Mid-Range — 1,000 ft², 4″ depth, edging and light compaction: Material: 25–40 tons; Delivery: $100–$320; Labor/Compaction: $150–$600; Edging/Geotextile: $20–$200; Total: $2,500–$4,500
- Premium — 1,500 ft², 4″ depth, premium rock, full edging, and expedited delivery: Material: 40–60 tons; Delivery: $150–$500; Labor/Compaction: $350–$900; Edging/Drainage: $100–$350; Total: $4,000–$7,000
Assumptions: market, project scope, and material type vary by region.
Ways To Save
To reduce crusher run costs, consider ordering in larger quantities to secure volume discounts, combining delivery with other projects to share travel charges, and selecting a material with a balanced fines content that still delivers good compaction. If timing allows, scheduling in off-peak periods may yield lower delivery fees and better contractor availability. Ask for a written estimate that itemizes material, delivery, labor, and any required accessories.